Office Development

This work was carried out for Dr. Roger Mugford. Bricks were re-claimed on site from a demolished barn (approx. 6000). All work carried out by me and Phil Pearcey (a traditional bricklayer, any lime work required he is your man). The roof was an insulated panelled finish. It was primarily an open plan office area for about 15 people with bathrooms and a communal kitchen area.   

Chertsey, Surrey

A traditional looking build with new building methods.

Kitchen and bathroom areas. All external doors were made on site to tie in with the look of the existing.